Complete Sanitary Ware Project Supply

Source complete bathroom and kitchen packages from Quality Sanitary Ware. We manufacture and coordinate showers, faucets, toilets, basins, vanities, kitchen sinks and accessories in one project purchasing plan, bringing model selection, samples, quotation, packing and delivery phases together.

Send your BOQ, room schedule or product list. Our team will prepare a coordinated proposal for your development, hotel or wholesale project.

Define the Complete Supply Scope

Start by identifying the products and components included in the procurement package. Keep the quantity unit clear for each line: a complete shower set, an individual head, a valve assembly and a replacement component are different purchasing items.

Product Groups in a Combined Sanitary Ware BOQ
GroupScope to recordConnected information
Shower productsComplete sets, heads, controls and accessoriesComponent list, installation layout and control function
Basin and kitchen mixersSelected models and configurationsMounting, connection details and finish
ToiletsSelected toilet models and required componentsInstallation dimensions and package scope
Vanities and basinsCabinets, basins and included fittingsDimensions, layout and installation drawings
Kitchen sinksSink models and selected accessory packagesMounting requirements and approved dimensions
Spares and service partsComplete spare products and individual partsCompatible model, part reference and quantity

Build a Multi-Category Project List

What Your Project Team Receives

What Your Project Team Receives
DeliverableWhat it includes
Product selectionProposed models grouped by category or room type
Specification scheduleDimensions, finishes, components and installation references
Sample planSelected product and finish samples for project review
Project quotationModels, quantities and the agreed package scope
Packing scheduleProduct and package identification for mixed-category orders
Delivery planProduct groups and shipment preparation organized by project phase

One Product Plan Across Room Types

Build separate packages for standard rooms, suites, upgraded residences and service areas. We coordinate the visible design and product selections while keeping the configuration and quantity for each room type clear.

The approved room package becomes the reference for repeat units, spare items and later delivery phases.

Assemble a Useful Project Quotation Brief

You can start with an existing BOQ or build a schedule using the project planner. Include the destination, required delivery phases and the product information already available. Where an item is defined by a drawing rather than a catalogue model, keep the drawing reference with that line.

Documents and Details for a Project Quotation
InputWhat it adds to the quotation
BOQ or fixture scheduleProduct quantities and the areas or room types they serve
Product referencesThe chosen model, configuration and finish
DrawingsInstallation dimensions and component relationships
Sample requirementsThe products and characteristics to be reviewed before approval
Delivery planDestination, phase quantities and required arrival windows
Packing briefPackage identification, protective packing and receiving requirements
Commercial briefRequested quotation basis and relevant purchasing terms

Send drawings and spreadsheets by direct email or WhatsApp, referencing the same enquiry. The website shortlist can accompany the brief, while the original documents retain the detailed schedules and drawings.

Keep Product Revisions Visible

A project line should identify more than the model name. Use the configuration, finish and specification revision to distinguish the actual purchasing item. If a selected product changes, update the affected areas or phases instead of silently replacing the original specification.

For example, a shower package with a fixed holder and the same mixer supplied with a slide rail should remain separate configurations. A change to the rail package affects the component list, packaging and installation review even if the mixer model stays the same.

Connect Packing Data With Delivery Phases

Use the actual outer package information for packing estimates. Some products use more than one package, and different categories have different protection and handling requirements. Record package quantities, dimensions, weights and pallet information against the shipment group.

The BOQ planner organizes product quantities. The mixed-order packing planner organizes the package data used for volume and weight estimates. Keep these stages connected, then review the final shipment against the physical packing and loading requirements.

Prepare a Clear Product Handover

Keep product references consistent across the approved order, package marks and receiving list. Separate service parts from complete products and identify the model each part belongs to. Include the installation and care information for the supplied products in the handover plan.

A clear record makes it easier for the project team to receive, identify and distribute products to the correct area. It also gives future maintenance and reorder requests a reliable starting point.

Choose the Planning Guide for Your Project

Frequently Asked Questions

What is a sanitary ware BOQ?

A sanitary ware bill of quantities lists the fixtures and components required for a project, with quantities and the relevant product specifications. It can be organized by room type, area or delivery phase before matching the lines to selected models.

Can I send an existing project BOQ?

Yes. Send your spreadsheet or document by email or WhatsApp and reference the same enquiry. Include the destination, selected products and delivery requirements so the quotation follows your project structure.

Can several categories be included in one project quotation?

Yes. Quality Sanitary Ware supports combined shower, faucet, toilet, vanity and kitchen sink requirements. Keep each category's models, configurations and quantities clear within the schedule.

Does the quantity planner calculate the final container loading plan?

The BOQ planner calculates product quantities. Packing estimates need the outer package dimensions, package counts, weights and handling information. The final loading arrangement also needs to be reviewed against the physical shipment.

How should product changes be handled after sample approval?

Record the revised product or configuration and identify the project lines it changes. Keep the new specification, component list and approval record together before ordering the revised version.

Turn Your Product Schedule Into a Coordinated Project Order

Send the BOQ, selected models, destination and delivery phases. Request a quotation that connects product specifications, sample planning, packing and project handover.

Build My Project Package

Request Your Factory Quote

Send your selected models, quantities and destination. Our team will prepare your wholesale, OEM or project quotation, with product specifications, sample options and production planning.

No account needed. Email enquiries go to info@qualitysanitaryware.com. Drawings and photos can be shared by direct email or WhatsApp.

Selected products (0)

Tell us which products you need, or choose models from the catalogue to build your quotation request.

Your selected products are saved on this device for up to 90 days. You can remove them at any time.
Shortlist storage details

Calculation summaries and destination country you explicitly carry forward share this retention period. Form messages and contact details are not saved with it. Clear the selection when finished.

Fields marked * are required.

Included only in the message you review and send.
Product categories (optional)
Up to 1,000 characters. Share drawings and photos by direct email or WhatsApp.0/1,000 characters
Add Project & OEM Details

Contact details are used only for the enquiry you review and send. Privacy policy

How Enquiries Work

Review your message, then choose Send Enquiry by Email or open WhatsApp and press Send there.

Review your selected models, quantities and contact details before choosing how to send your enquiry.